The Spa Casino

The “Cazinoul Băilor” Museum Centre in Vatra Dornei — culture, concerts and events in a heritage building.

The restored main façade of the Spa Casino in Vatra Dornei, its windows lit at dusk
The Spa Casino after restoration, at dusk. 5 Republicii Street, Vatra Dornei.

From Ruin to the Pearl of Bukovina

For a century, the Spa Casino (Cazinoul Băilor) in Vatra Dornei was the most beautiful building in Bukovina. Then, for nearly four decades, it was the saddest. Between 2019 and 2023 I was on the site that brought it back to life, from the first day to final acceptance. This is its story, told by someone who climbed into the attic, went down into the basement and counted, alongside the craftsmen, every cubic meter of timber and every restored ornament.

An imperial pavilion for a spa town

The Casino was built between 1896 and 1898 to a design by the Viennese architect Peter Paul Brang, as the central pavilion of the spa resort. Its acknowledged model was the casino in Baden, and the order to begin construction bore the signature of Emperor Franz Joseph. The official inauguration took place on July 10, 1899.

The building was conceived for an entire social life: a theater and ballroom, a library, a restaurant, a pastry shop. Franz Joseph and Archduke Franz Ferdinand walked through its doors, later Lucian Blaga and Nicolae Iorga, together with generations of guests taking the waters at Dorna. It does not stand alone: it is surrounded, as in an ensemble, by other monuments from the same year, 1896 — the “Unirea” Spring, today the Hotel Maestro, to the east; the former Villa 1, today the Hotel Carol, to the west; and the Casino park, which ends at the “Santinela” Spring, to the south.

Technical drawing of the main façade of the Spa Casino, with the domed central block and the two corner towers
The main façade, in the survey drawing used for the restoration: the domed central block, the side wings and the corner towers with their lanterns.

The building has a footprint of 1,331 square meters and is a historic monument listed in the national Register of Historic Monuments. The floor plan says a great deal about what it once was: a large hall at the center, with a stage and balcony, surrounded by salons, galleries and corridors that open onto the park through tall arched windows.

Ground floor plan of the Spa Casino, historic black-and-white drawing
Ground floor plan: the central hall, the side salons and the four corner towers.

Forty years of decline

The history of the twentieth century passed through the Casino without mercy. It was damaged in both world wars, nationalized in 1948 and turned into a workers’ club. In 1988 it was decommissioned, because the condition of the building no longer allowed it to be used. After 1990 it was simply left to fall apart.

Anyone who passed by in those years remembers the sight: broken windows covered with plastic sheeting, plaster fallen away down to the brick, vegetation growing into the walls, and cows grazing in the back yard. Moisture rose by capillary action from the basement, the walls were coming apart, and technical assessments described a building in a pre-collapse state.

The Spa Casino in ruins, seen from behind the construction fence, with stacks of logs in the foreground and a sign reading “Unauthorized persons strictly prohibited”The Casino façade before restoration, with fallen plaster, blocked-up windows and a crumbling entrance stair
Before the works: the building seen from the street and the façade facing the park, with fallen ornaments and blocked-up windows.
Large padlocked wooden door in a brick arch from which the plaster has almost entirely fallenEmptied gallery with arched windows, timber props under the ceiling and piles of planks on the floorInterior wall of exposed brick, with a wooden door hanging high up and timber beams above
Exposed brickwork, galleries held up by props, doors that no longer led anywhere.

Some details nevertheless survived, like witnesses. The medallion with the angel holding a bouquet of roses, in the stucco of the entrance hall, still kept its colors — the blue of the sash, the pink of the flowers — even as the wall around it came away piece by piece.

Stucco medallion with a winged angel holding a bouquet of pink roses and a blue sash, surrounded by cracked plaster and exposed brick
The angel medallion in the entrance hall, before restoration. For us, it became the symbol of the entire project.

Funding: the long road to the first day on site

In 2004 the building was returned to the Fondul Bisericesc Ortodox Român al Bucovinei (the Romanian Orthodox Church Fund of Bukovina), administered by the Archdiocese of Suceava and Rădăuți. The funding application was submitted in 2016, and the contract was signed in December 2017 under the Regional Operational Programme 2014–2020, Priority Axis 5 — conservation, protection and enhancement of cultural heritage. The project carried a long and precise name: “Consolidation and restoration of the Spa Casino monument building, with conversion into the Spa Casino Museum Center”.

Representatives of the authorities and of the Archdiocese signing documents at a long table, in a hall with mirrors and chandeliers
December 2017: signing the funding contract in the Hall of Mirrors.

The total value of the project was 21,740,665.19 lei, of which 20,975,987.54 lei was non-reimbursable financial assistance. Along the way, the Archdiocese of Suceava and Rădăuți, through His Eminence Archbishop Calinic, approved additional works and funds of more than 10 million lei from its own resources — costs that were ineligible under the European project. This money paid for the rehabilitation of the central block, the zinc roof covering, the balustrades, the marble in the central hall, the furniture, the natural-stone cladding of the plinth, and the start of the landscaping of the park. With all the additions, the investment came close to 30 million lei.

The order to begin the works was issued on Monday, April 15, 2019, also in the Hall of Mirrors of the Vatra Dornei City Hall, in the presence of His Eminence Archbishop Pimen, then Archbishop of Suceava and Rădăuți.

Four years on site

In the project I was the financial officer and the coordinator on the beneficiary’s side, as an engineer and advisor in the Agro-Forestry Sector of the Archdiocese. That meant budgets, progress statements and reports, but above all presence: I was on site from the first days to final acceptance, in every season.

And the seasons at Dorna are unforgiving. Long winters shortened the exterior working season, and the building had enemies of its own. The hardest to defeat was the fungus Merulius lacrymans — dry rot — which had attacked not only the timber but also the mortar between the bricks, from the basement up to the attic. In April 2020, a year after the start order, we were at roughly 30% of the works.

The great hall of the Casino during the works, seen from above: workers in yellow hard hats next to metal sheets, walls stripped to the brick and the stage in the background
The great hall in the middle of construction: walls stripped back to the brick, the stage in the background, sheet metal ready for the roof.

Water, the first adversary

Nothing could be restored as long as the walls were drawing water from the ground. So we started at the bottom: a perimeter drain around the entire building to remove moisture from the foundations, followed by the consolidation of the masonry and of the brick vaults in the basement.

The basement with brick vaults, cleaned out, with a drainage channel running down the middle of the floor
The basement, with its consolidated brick vaults and the drainage channel that carries water away from the foundations.

The roof and its two hundred cubic meters of timber

Up in the attic, the original roof structure was largely compromised. We replaced more than 200 cubic meters of timber in the roof. The covering was remade in zinc sheet, strip by strip, and the corner towers got their lanterns and scales back.

The Casino attic, with old timber beams and braces alongside new reddish pieces, and a wooden walkway on which several people are standingTwo men shaking hands on the roof, one in a yellow hard hat holding a hammer, in front of a new zinc-sheet covering
In the attic, new timber next to old. On the roof, closing off a section of the zinc covering.
The dome of a corner tower under restoration, with metal scales and a windowed lantern, set on a brick base, with forested mountains in the backgroundTwo men in a site office, with binders, drawings and a yellow hard hat on the wall; behind them, a drawing of the Casino façade
The lantern of a corner tower, under restoration. In the site office, with the façade survey on the wall, where decisions were made every day.

In August 2022, when Prime Minister Nicolae Ciucă visited the site, I told him plainly that before the restoration the building “was close to collapse”. I showed him the drain, the timber in the roof, the ornaments that had to be remade from scratch, and explained what the contribution of the Archdiocese and the support of the Suceava County Council had meant.

Three men in front of the Casino under scaffolding, on a sunny day; on the left, workers next to a concrete mixer and wheelbarrows
Summer on site: the main façade under scaffolding, the central dome already roofed.

Painstaking work: where every line is drawn by hand

The hardest part was not, as many might think, the masonry. “If the first phase was about building and consolidation, now the work is painstaking and delicate. Every single line is drawn by hand” — that is how I described the finishing stage in February 2023.

The ornaments that could still be saved were consolidated and completed. Those that could not were remade: cast in the on-site workshop, then installed and finished in place by plasterers who spent months on the scaffolding.

Plasterer in blue overalls and a cap placing a cast plaster cornice element on a workbenchA plasterer in a blue hard hat shaking hands with a man in a black jacket, who points to a restored stucco ornament with ribbons and fruit on the wall
Cornice elements cast in the on-site workshop, and a restored stucco ornament in the salon with arched windows.

The decorative finishes were also the work of the women restorers from Ciocănești — the Bukovina commune known for its houses with painted façades. One of them appears below on the scaffolding, gilding a ceiling rosette.

Restorer on scaffolding gilding a ceiling rosette with a brush, while a colleague watches from belowGroup of women in red T-shirts in front of large letters spelling “Ciocănești”, in a square with flags
Gilding a ceiling rosette. The team of restorers from Ciocănești.

Costs rose by almost 2 million euros over the course of the works, because of rising material prices, exchange-rate differences and work that no assessment could have foreseen before the walls were opened up. The final months were a race in which winter, once again, set the pace.

Salon with dark wood paneling, large arched windows and a chandelier wrapped in plastic; on the floor, screed in progress and canisters of materials; snow falling outsideThe main façade of the Casino almost finished, under an overcast sky, with a yellow machine in front of the steps and scaffolding on the central block
Winter 2022–2023: paneling installed, the floor still in progress. The façade, almost done, with the last scaffolding on the central block.

Acceptance and reopening

The works were formally accepted on November 15, 2023. I chaired the acceptance committee. If I had to sum up the intervention in one sentence: we drew the water out of the walls with the perimeter drain, consolidated the masonry and the vaults, restored the finishes with materials and techniques as close as possible to the originals, and added architectural lighting that shows the building at its best. Everything new was done in the spirit of the monument.

Several dozen workers in work gear, with hard hats and high-visibility vests, on the steps of the Casino in winter, with snow along the edges
The people who made the restoration possible, on the steps of the Casino.

On November 28, 2023, Bukovina Day, 105 years after the union of Bukovina with Romania, the building was consecrated by His Eminence Archbishop Calinic and His Grace Bishop Damaschin Dorneanul and reopened to the public as the “Cazinoul Băilor” Museum and Multicultural Center. That day I presented the building to those attending and spoke about the sustained effort to restore the former beauty of a landmark for Suceava County and for all of northern Romania.

Ciprian Dumitru Muscă, a journalist and a camera operator, photographed in front of the restored angel medallion and the gilded cartouche bearing the year 1898
With a television crew, in front of the same angel medallion, now restored, next to the gilded cartouche with the year 1898.

What the Casino is today

The building now serves as a museum and cultural venue: permanent and temporary exhibitions, concerts, conferences, book launches, performances. The great hall, with its stage and balcony, is once again a place for performances. Private collections and temporary exhibitions are on display in the central hall and the galleries; the basement, with its brick vaults, houses exhibition spaces alongside the building’s technical installations.

The restored great hall, white with gilded ornaments, arched windows, a chandelier and rows of chairs, seen from the stage toward the balconyExhibition salon with a polished marble floor, large arched windows and display panels on the walls
The great hall, with its stage and balcony, ready for a concert. The marble gallery, used for exhibitions.
The restored basement: exposed brick vaults, a herringbone brick floor and exhibits displayed between the pillars
The basement after restoration: the same brick vaults, now an exhibition space.

Some of the events held since the reopening — exhibition openings, concerts, theater performances — are collected below, in the journal. On Bukovina Day 2024, as President of ASFOR, I issued an invitation I repeat whenever I get the chance: come to Vatra Dornei and enjoy the pearl of Bukovina.

Aerial view of Vatra Dornei, with the white Spa Casino at the center, the park behind it and forested hills under the first snow
The Spa Casino at the heart of Vatra Dornei, with the resort park behind it.

Project fact sheet

ProjectConsolidation and restoration of the “Cazinoul Băilor” monument building, with conversion into the “Cazinoul Băilor” Museum Center (SMIS code 120362)
BeneficiaryFondul Bisericesc Ortodox Român al Bucovinei (Romanian Orthodox Church Fund of Bukovina) — Archdiocese of Suceava and Rădăuți
FundingRegional Operational Programme 2014–2020, Priority Axis 5, Investment Priority 5.1
Managing authorityMinistry of Regional Development, Public Administration and European Funds; intermediate body: ADR Nord-Est (North-East Regional Development Agency)
Total value21,740,665.19 lei, of which 20,975,987.54 lei non-reimbursable; more than 10,000,000 lei own contribution from the Archdiocese
ContractorJoint venture SC IASICON SA — SC POLARH DESIGN SRL (lead: IASICON)
Site supervisionSC C.G. Design Cons SRL, Prof. Cătălin Onuțu, PhD
Project managementSC Regional Consulting SRL, director Doina Iacoban (2016–2023)
Duration of worksApril 15, 2019 — November 15, 2023

What remains

For me, the Casino was more than a restoration. It was proof that heritage can be saved — with patience, with European funds used properly, and with people who stay on site until the last brushstroke. The consolidation and rehabilitation would not have been possible without skilled and dedicated craftspeople — masons, carpenters, tinsmiths, plasterers, restorers, engineers — and without an institution that believed in the project when the costs went up.

A building whose yard had cows grazing in it became, once again, in 2023, the pearl of Bukovina.